Campaign Workflow from Intake to Launch

How a campaign moves from request to live: intake and triage, the brief, build and creative production, review and approval gates, launch checks and handover.
Guideintermediate10 min readUpdated

The workflow in one picture

Seen from above, almost every campaign workflow has the same shape, whatever the channel and whatever tool holds the work. A request comes in and is triaged. Accepted requests get a brief, which is agreed at a kick-off. Build, creative production and trafficking run, often in parallel. The finished work passes one or more review and approval gates. A launch check confirms that what is about to go live matches what was approved. After launch, the campaign is handed to whoever will monitor and optimise it.

StageEntry conditionExit conditionTypical owner
IntakeA request using the intake formAccepted, declined or parked, with a reasonOperations or the channel lead
Brief and kick-offAccepted requestBrief signed by the requester and the campaign ownerCampaign owner
Build, creative, traffickingSigned briefAll assets and set-ups complete against the briefSpecialists in each channel
Review and approvalComplete buildApproved by every required reviewer, or returned with reasonsReviewers named in the approval matrix
Launch checkApproved workCheck passed and recordedSomeone other than the builder
HandoverLive campaignMonitoring owner confirmed, measures and review dates setCampaign owner

Two features of this picture matter more than the number of stages. First, every stage has an entry condition, so work cannot drift forward half-ready. Second, every gate has a named owner and a defined output, so "waiting for sign-off" always means waiting for a specific person to make a specific decision. Where either is missing, work stalls without anyone noticing until the launch date arrives. To see how far your own campaigns depart from this picture, mapping a marketing process traces a few recent items through the route as they actually ran, waits and loops back included. When campaigns keep missing their dates, the diagnosis for campaigns that keep launching late reads that route stage by stage to find where each late launch waited.

Intake and triage

Intake is the stage that does most to protect everything after it, because each piece of missing information at intake becomes a question asked later at greater cost. A good intake route has one entry point, usually a form in the work management system, and a short list of required fields. The test of a field is whether its absence has delayed a campaign before; if not, leave it out, because long forms push requesters back to email.

Intake fieldWhy it is requiredWhat happens without it
Objective and audienceDecides whether the request belongs in marketing's plan at allWork starts on requests nobody would prioritise
Deadline and the reason for itSeparates fixed dates from preferencesEvery request is urgent
Channels requestedTells triage which specialists are neededCapacity is discovered late
Budget sourceConfirms the spend is availableBuild completes and launch waits for money
Offer or claim, if anyFlags work that needs legal or compliance reviewReview happens after build, and build is redone
Proposed campaign nameStarts the naming convention at the sourceNames are invented at launch and differ by platform
Success measureDefines what reporting will look forThe campaign launches without a target

Triage is the decision on each request: accept, decline, park until a later window, or route to the fast lane for low-risk repeatable work. Which work qualifies for the fast lane, and what sends an item back to the full route, is written down before triage relies on it. Triage needs a person with the authority to say no, and a regular slot rather than a continuous trickle; a short triage meeting a couple of times a week is enough for most teams. Deciding which accepted requests come first is a planning decision about capacity rather than an operations one, and the guide to prioritising work and capacity covers it. What operations owns is that every request passes through triage and that the outcome is recorded with a reason the requester can see. Questions for the analytics team follow the same pattern with a different intake, one that asks for the decision behind the question, as running an analytics request process describes.

Brief and kick-off

The brief turns an accepted request into a description of the work that everyone can build against. Its structure belongs elsewhere: the campaign brief guide explains what a strong brief contains, and the campaign brief template gives a ready format. The workflow question is narrower: when is a brief finished, and who says so?

A brief is finished when the requester and the campaign owner have both signed it, and signing means agreeing that the objective, audience, message, offer, channels, budget and measure are right. The measure should connect to a KPI the business already reports, not one invented for the campaign. Changes after signing go back through the same signature, which sounds rigid but is the single most effective way to stop creative being rebuilt. Most rework at review traces back to a brief that was never agreed, or was quietly changed by one party after the fact. Edits to work that has already passed review follow the same logic, and the guide to handling changes to marketing work after approval sets out which review each kind of change reopens and how small fixes are confirmed.

The kick-off is a short meeting, or an asynchronous thread for small campaigns, where the people who will build the work read the signed brief together and raise questions. It is also where the plan for the build stage is agreed: which assets are needed, who produces each, which ones depend on others, and which reviews will be needed so that reviewers can hold time. Reviewers who learn about a campaign at the review stage will always be slower than reviewers who knew it was coming.

Build, creative and trafficking

Build is where most of the effort goes and where the workflow should intervene least. The specialists know their channels; the workflow's job is to make sure they start from a signed brief, work from current templates and approved assets, and record progress in the work system so that the calendar stays true.

Three things deserve explicit handling. Dependencies come first: copy usually blocks design, design blocks resizing, and every asset blocks trafficking. Recording them in the work system makes the critical path visible and stops the last week being spent waiting. Procedures come second: recurring build tasks such as setting up a paid social campaign, building an email or publishing a landing page should each have a written procedure, which the SOP tutorial shows how to write. Tracking comes third: every link needs its UTM parameters built from the naming convention at this stage, not added on launch day, because a parameter added in a hurry is the most common source of unattributable traffic.

Trafficking, placing finished creative into ad servers and platforms with the right dates, targeting and tracking, is a build task with its own discipline. For programmatic and ad-server work, the trafficking workflow guide covers the steps and checks in detail; the operations point is that trafficking is a stage with an entry condition (approved creative and a placement plan) and an exit condition (set-up complete and ready for the launch check), not an afterthought.

Review and approval gates

Review gates exist to catch errors and risks before they reach the public. They become a problem when there are too many, when reviewers are chosen by seniority rather than by the risk the work carries, or when every reviewer sees every version. The fix is to decide reviews by risk: a matrix that says which kinds of work need which reviewers, maintained by operations and applied the same way every time. The approvals and compliance guide builds that matrix; the workflow only needs to know who is on it for each campaign, which the brief records.

Within the workflow, three rules keep reviews fast. Reviewers see the signed brief alongside the work, so they review against intent rather than taste. Feedback is consolidated: one round of comments from all reviewers in parallel, with one person resolving conflicts, beats sequential rounds where each reviewer reopens the last. And every return carries a reason chosen from a short list, such as off-brief, inaccurate claim, brand standard, legal or technical, so that rework can be analysed. A gate that returns work without reasons teaches the team nothing. Social accounts publish much that never enters this workflow, such as replies and reactive posts, and the social media approval workflow tutorial sets the separate, faster route those need.

Service levels help, provided they are agreed with reviewers rather than imposed. A reviewer who knows the expected turnaround and sees a queue of incoming work can plan; one who receives an urgent request on the afternoon before launch cannot. The tutorial on setting service levels for marketing requests agrees them type by type from the team's own records, with the requester's side written in. When one campaign runs in several countries, the tutorial on rolling out a campaign across markets adds a reviewer for each market's language, commercial message and claims, with deadlines in each market's clock.

Launch checks and post-launch handover

The launch check confirms that what is about to go live is what was approved: the right creative, the right dates, the right audience and budget, working links and working tracking. It is done by someone other than the builder, because builders check what they meant to do rather than what they did. The published campaign launch QA checklist is a ready starting point. The result of the check is recorded against the campaign in the work system, including who ran it, so that a later problem can be traced to a gap in the checklist rather than argued about.

Launch is not the end of the workflow. The handover after launch names the person who will monitor the campaign, the measures they will watch, the dates of the first and subsequent reviews, and what they are allowed to change without going back through approval. Early signals such as CTR and delivery pacing tell the monitor whether the campaign is behaving as expected in its first days; the agreed success measure tells them whether it worked. A campaign without a named monitor tends to run unattended until someone notices the budget has gone. When the campaign ends, the campaign post-mortem template records which stage of this workflow contributed to any shortfall and the changes agreed for next time. If an error reaches a live ad or page after launch, the live ad and page error response SOP contains and corrects it, using the launch check's record to know what was approved. When problems on live campaigns are found days after they began, the diagnosis of live campaign problems found too late reads how each one was found, traces why nobody saw it and routes each pattern to the page that owns its cause.

Illustrative example — not a real result

A software company redraws its workflow

Fenwright, a B2B software company with a marketing team of fourteen, mapped its last ten campaigns from request to live. Median cycle time was 26 working days. Six campaigns had been rebuilt after review, and in five the reason was an offer or a message that changed after build started. Requests arrived through four routes. The team introduced a single intake form with seven required fields, a rule that build could not start without a brief signed by both requester and owner, and parallel review with a two-day turnaround agreed with the reviewers. A fast lane covered social posts and nurture emails from approved templates. Over the next two quarters, rebuilds after review fell to one in ten campaigns and median cycle time to 17 working days.

Common mistakes

  • Designing the workflow around the tool. The stages should come from the decisions the team needs to make; the work management system is configured to match, not the other way round.
  • Intake forms that ask for everything. Each required field should prevent a known failure. Long forms drive requesters back to email and the workflow loses its front door.
  • Starting build before the brief is signed. It feels faster and is the main source of rework at review.
  • Sequential reviews with no consolidation. Each reviewer reopens the previous round. Review in parallel and give one person the job of resolving conflicting feedback.
  • The builder running the launch check. A second person catches what the builder cannot see.
  • No fast lane. Forcing every small post through the full route teaches people to bypass the workflow altogether.
  • Ending the workflow at launch. Without a handover, nobody owns the live campaign, and problems are found at month end rather than on day two.
  • Never changing the workflow. Review cycle time and rework by stage regularly, and remove gates that never return work as readily as you add new ones. The process hub explains how to measure both.

Frequently asked questions

How many stages should a campaign workflow have?

As few as the decisions require. Most teams need intake, brief, build, review, launch and handover, and anything beyond that should exist because a specific recurring failure justifies it. If a stage never sends work back and never changes a decision, merge it into its neighbour.

Should small requests go through the full workflow?

No. Define a fast lane for low-risk, repeatable work such as a social post using approved assets or a scheduled email from an approved template. The fast lane still uses intake and the launch check, but skips the brief and the full review, and the rules for what qualifies are written down rather than decided case by case.

Who should own the campaign workflow?

One person in operations owns the design of the workflow: its stages, gates and the measures used to review it. Each campaign still has its own owner who moves it through the stages. Mixing the two roles makes it hard to change the workflow, because every change looks like criticism of a particular campaign.